gogo
Amazon cover image
Image from Amazon.com

Achieving lean changeover : putting SMED to work / John R. Henry.

By: Material type: TextTextPublication details: Portland, Or. : Productivity ; London : Taylor & Francis [distributor], 2012.Description: 200 p. : ill. ; 26 cmISBN:
  • 9781466501744 (pbk.) :
  • 9781466501744 (pbk.)
Subject(s): DDC classification:
  • 658.5 HEN
LOC classification:
  • TS155
Contents:
1.Introduction -- 2.Changeover costs -- 3.Standard operating procedures -- 4.Eliminate -- 5.Simplify -- 6.Externalize -- 7.Execute -- 8.Develop and implement a program.
Summary: Taking a holistic approach, this book examines changeover/SMED (single minute exchange of die), the conversion of a manufacturing process/machine from running the current product to running the next product. It addresses both the machinery issues and the operational issues.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Long Loan TUS: Midlands, Main Library Athlone General Lending 658.5 HEN (Browse shelf(Opens below)) 1 Available 216183

Includes index.

1.Introduction -- 2.Changeover costs -- 3.Standard operating procedures -- 4.Eliminate -- 5.Simplify -- 6.Externalize -- 7.Execute -- 8.Develop and implement a program.

Taking a holistic approach, this book examines changeover/SMED (single minute exchange of die), the conversion of a manufacturing process/machine from running the current product to running the next product. It addresses both the machinery issues and the operational issues.

Powered by Koha